Cypress College logo

Educational Excellence • A Great Environment • Personal Attention • Value and Quality • A Fun Experience

Extreme Campus Makeover in Progress
August 18, 2008

  •         We at Cypress College appreciate your support and flexibility during this period as we build a more efficient campus.

  •         Recently, the college reached milestones with opening the new Student Center (SC) Building, completing the new construction on campus, and the Bookstore Building (BK). Work on the front of the campus - the area between those buildings and College Circle Drive - is continuing, the pathwas are being opened for the start of the semester. The next revision of the campus map is not known at this time as significant changes are not currently anticipated.

Download a printable version of these maps (Adobe Acrobat, 720 KB)

legend for the maps below

map showing closures and pedestrian access on the ground level

map showing closures and pedestrian access on the piazza level

information about the locations of CCCE 1 through 5 versus CCCE 10 through 12; students with visual imparements should visit the Disabled Students Programs and Services office for assistance navigating to these two areas

a legend for building names and abbreviations on this map



Close this Window